docs/CommissioningPlan/P1.2
v6 v7 13 13 • Visually inspect if all the contents are safe and secure. 14 14 • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 15 * Move all needed box contents to the cleanroom. This may require some mounting or handling structures. 15 16 **Success criteria** 16 17 • No damage to any container or boxes. … … 26 27 **Comments** 27 28 28 MB:I would add to move all needed box contents in the clean room. This requires probably some mounting, e.g. of the shark-nir handling used to keep the instrument while integrating cryostat and then making tests 29 MB:I would add to move all needed box contents in the clean room. This requires probably some mounting, e.g. of the shark-nir handling used to keep the instrument while integrating cryostat and then making tests [DONE]