Changes between Version 24 and Version 25 of docs/CommissioningPlan/P1.2


Ignore:
Timestamp:
06/28/22 10:01:26 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.2

    v24 v25  
    4242- opened box-1 to take out the instrument and re-mounted it empty to be transported to base camp for storage.
    4343- inspected Box-5: all fine. It was located on a shelf in the high bay for later use in October (?) run.
    44 - Marco cleaned the rust out of the 2 parts (this was already seen partially in Padova after packing the box), put silicone on them, and re-placed them in Box-6. Later in the afternoon Jacopo and Marco placed all extra pieces from box-7 into box-6. Box#6 is now equipped with wheels.
     44- Marco cleaned the rust out of the 2 parts (this was already seen partially in Padova after packing the box), put silicone on them, and re-placed them in Box-6. Later in the afternoon Jacopo and Marco placed all extra pieces from box-7 into box-6. Box-6 is now equipped with wheels.
    4545- unpacked Box-7, and took out SHARK-NIR handling and the rest of the parts. The ties used to keep in place the metal parts on the bottom were all broken, but parts were shifted by a few cms and no issues were seen.
    4646- Box-16: Davide installed the two workstations into server room B with the help of LeRoy. After a bit of misunderstanding, we are quite sure that the subnet will be 192.168.61.X as foreseen. When Sasha workstation arrives, it will be initially mounted on the clean room rack because of the missing mono-mode fiber connection from the server room.
    4747- SHARK-NIR was installed onto its handling thanks to LBT crew support
     48- The Ultrashock Sensor that was mounted on the Instrument provided the following data:
     49  - Pressure variation in the range (698.30 / 1017.50) mbar
     50  - Temperature variation in the range (13.6 / 30.4) °C
     51  - Humidity variation in the range (35.7 / 68.6) %
     52  - Shock along the X-axis in the range (-4 / 4) g. One peak of around 4g on (06/24/22 - 07:24)
     53  - Shock along the Y-axis in the range (-4.0 / 8.6) g. Two peaks of around 8g on (06/21/22 - 13:09) and (06/22/22 - 01:39)
     54  - Shock along the Z-axis in the range (-0.2 / 5) g, w/o any strong event
    4855
    4956