Changes between Version 15 and Version 16 of docs/CommissioningPlan/P1.2
- Timestamp:
- 01/14/22 12:39:42 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.2
v15 v16 1 1 == P1.2 Opening of boxes in LBT Hall, inspection of the contents and installation on units on their handlings == 2 2 3 - **Phase** : 1 3 4 - **Status** : Draft … … 5 6 - **Recurrence** : once 6 7 - **Duration** : 1 day 8 7 9 **Description** 8 10 - Unpack the containers/boxes carefully and visually inspect the components inside 11 9 12 **Prerequisites** 10 13 - All the necessary tools and safety features to do the unpacking and moving. 14 11 15 **Procedure** 12 16 - Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. … … 15 19 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 16 20 - Set up the handlings for the cryostat and the optical bench. install the corresponding onto the handling and move to the cleanroom. 21 17 22 **Templates** 18 23 … … 20 25 - No damage to any container or boxes. 21 26 - No shock sensors activated. 27 22 28 **Notes** 23 29 … … 25 31 - Crane operator (mountain bay) to lift and move stuff. 26 32 - 1-2 crew to support unpacking and moving. 33 27 34 **Date performed and by whom** 28 35