docs/CommissioningPlan/P1.2
v14 v15 1 == P1.2 Opening boxes, their visual inspection, and mounting the units on the handling==2 • **Phase**: 13 • **Status**: Draft4 • **Category**: Unpack, Assemble, and Verification (C1)5 • **Recurrence**: once6 • **Duration**: 1 day1 == P1.2 Opening of boxes in LBT Hall, inspection of the contents and installation on units on their handlings == 2 - **Phase** : 1 3 - **Status** : Draft 4 - **Category** : Unpack, Assemble, and Verification (C1) 5 - **Recurrence** : once 6 - **Duration** : 1 day 7 7 **Description** 8 •Unpack the containers/boxes carefully and visually inspect the components inside8 - Unpack the containers/boxes carefully and visually inspect the components inside 9 9 **Prerequisites** 10 •All the necessary tools and safety features to do the unpacking and moving.10 - All the necessary tools and safety features to do the unpacking and moving. 11 11 **Procedure** 12 • Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. 13 • Visually inspect if all the contents are safe and secure. 14 * Inspect if the tilt and shock sensors are activated or not. 15 • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 16 * Set up the handlings for the cryostat and the optical bench. install the corresponding onto the handling and move to the cleanroom. 12 - Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. 13 - Visually inspect if all the contents are safe and secure. 14 - Inspect if the tilt and shock sensors are activated or not. 15 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 16 - Set up the handlings for the cryostat and the optical bench. install the corresponding onto the handling and move to the cleanroom. 17 **Templates** 17 18 18 19 **Success criteria** 19 •No damage to any container or boxes.20 *No shock sensors activated.20 - No damage to any container or boxes. 21 - No shock sensors activated. 21 22 **Notes** 22 23 23 24 **LBTO support** 24 • Crane operator (mountain bay) to lift and move stuff. 25 * 1-2 crew to support unpacking and moving. 26 **Associated SHARK-NIR personnel** 27 • 25 - Crane operator (mountain bay) to lift and move stuff. 26 - 1-2 crew to support unpacking and moving. 28 27 **Date performed and by whom** 29 28 30 **Comments**