Changes between Version 18 and Version 19 of docs/CommissioningPlan/P1.1
- Timestamp:
- 02/09/22 19:32:42 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.1
v18 v19 8 8 9 9 **Description** 10 - Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay10 - Visual inspection of all the SHARK-NIR boxes at the LBT mountain bay. 11 11 12 12 **Prerequisites** 13 - All the SHARK-NIR containers and boxes should be at LBT mountain bay13 - All the SHARK-NIR boxes should be at LBT mountain bay. 14 14 15 15 **Procedure** 16 - Visually inspect if all the SHARK-NIR containers andboxes at the LBT mountain bay are safe and secure.17 - Inspection of the state of tilt and shock sensor .16 - Visually inspect if all the SHARK-NIR boxes at the LBT mountain bay are safe and secure. 17 - Inspection of the state of tilt and shock sensors. 18 18 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 19 19 … … 21 21 22 22 **Success criteria** 23 - No damage to any container orboxes.23 - No damage to any boxes. 24 24 - No shock or tilt sensors were activated (TBD). 25 25 … … 29 29 **LBTO support** 30 30 - Crane operator (mountain bay) to lift and move stuff (TBD). 31 - 1-2 crew to support moving containers/boxes.31 - 1-2 crew to support moving boxes. 32 32 33 33 **Date performed and by whom**