docs/CommissioningPlan/P1.1
v12 v13 1 1 == P1.1 Inspection of the closed boxes == 2 2 3 • **Phase** : 1 4 • **Status** : Draft 5 • **Category** : Unpack, Assemble, and Verification (C1) 6 • **Recurrence** : once (when SHARK-NIR reaches LBT) 7 • **Duration** : half a day 3 - **Phase** : 1 4 - **Status** : Draft 5 - **Category** : Unpack, Assemble, and Verification (C1) 6 - **Recurrence** : once (when SHARK-NIR reaches LBT) 7 - **Duration** : half a day 8 8 9 **Description** 9 10 - Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay 11 10 12 **Prerequisites** 11 13 - All the SHARK-NIR containers and boxes should be at LBT mountain bay 14 12 15 **Procedure** 13 16 - Visually inspect if all the SHARK-NIR containers and boxes at the LBT mountain bay are safe and secure. … … 20 23 - No damage to any container or boxes. 21 24 - No shock sensors activated. 25 22 26 **Notes** 23 27 … … 25 29 - Crane operator (mountain bay) to lift and move stuff. 26 30 - 1-2 crew to support moving containers/boxes. 31 27 32 **Date performed and by whom**