Changes between Version 10 and Version 11 of docs/CommissioningPlan/P1.1
- Timestamp:
- 01/14/22 12:23:36 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.1
v10 v11 7 7 • **Duration** : half a day 8 8 **Description** 9 •Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay9 - Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay 10 10 **Prerequisites** 11 •All the SHARK-NIR containers and boxes should be at LBT mountain bay11 - All the SHARK-NIR containers and boxes should be at LBT mountain bay 12 12 **Procedure** 13 • Visually inspect if all the SHARK-NIR containers and boxes at the LBT mountain bay are safe and secure. 14 * Inspection of the state of tilt and shock sensor. 15 • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 13 - Visually inspect if all the SHARK-NIR containers and boxes at the LBT mountain bay are safe and secure. 14 - Inspection of the state of tilt and shock sensor. 15 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 16 17 **Templates** 18 16 19 **Success criteria** 17 •No damage to any container or boxes.18 *No shock sensors activated.20 - No damage to any container or boxes. 21 - No shock sensors activated. 19 22 **Notes** 20 23 21 24 **LBTO support** 22 • Crane operator (mountain bay) to lift and move stuff. 23 * 1-2 crew to support moving containers/boxes. 24 **Associated SHARK-NIR personnel** 25 25 - Crane operator (mountain bay) to lift and move stuff. 26 - 1-2 crew to support moving containers/boxes. 26 27 **Date performed and by whom** 27 28 **Comments**