Changes between Version 6 and Version 7 of docs/CommissioningPlan/P1.12


Ignore:
Timestamp:
04/22/22 18:38:56 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.12

    v6 v7  
    1414- Electronics cabinets on.
    1515- The cryostat should be running and cooled down.
     16- Activity P1.0 (and, if required, P1.11) should be completed.
    1617
    1718**Procedure**