Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.12
- Timestamp:
- 04/22/22 18:37:08 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.12
v5 v6 1 == P1.12 Testing of SCICAM image grabbing by SOUL-AO==1 == P1.12 Verification of the contrast for coronagraphic masks== 2 2 3 3 - **Phase** : 1 … … 5 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : once 7 - **Duration** : 2 days7 - **Duration** : 1 day 8 8 9 9 **Description** 10 - Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR.10 - Verify the center mask algorithm, and calculate the rejection factor. Verify the contrast obtained for different sets of masks on the scientific camera. 11 11 12 12 **Prerequisites** 13 - ICE compatibility between SHARK-NIR and SOUL-AO system. 14 - SCICAM image should have a header following FITS standard. 13 - SHARK-NIR is connected to the LBT network. 14 - Electronics cabinets on. 15 - The cryostat should be running and cooled down. 15 16 16 17 **Procedure** 17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository. 18 - Check if SOUL-AO can grab the image and analyze the PSF. 18 - TBW 19 19 20 20 **Templates** 21 21 22 22 **Success criteria** 23 - SOUL-AO SW can grab the SCICAM image. 23 - The mask-centering algorithm works efficiently. 24 - The raw contrast estimated is within specifications for all the coronagraphic masks. 24 25 25 26 **Notes** 26 - The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible. 27 - Points of contact: Alfio and Fabio from Arcetri. 27 28 28 29 29 **LBTO support** 30 30 - Liquid Nitrogen refill is required in the cleanroom. 31 - Support of an IT personnel (for help related to network configuration) and an SW personnel (for help related to the TCS interface).32 31 33 32 **Date performed and by whom**