    1 == P1.12 Testing of SCICAM image grabbing by SOUL-AO ==
     1== P1.12 Verification of the contrast for coronagraphic masks==
    22
    33- **Phase**             :       1 
     
    55- **Category**  :       Daytime testing (functionality and operability) (C3)
    66- **Recurrence**        :       once
    7 - **Duration**  :       2 days
     7- **Duration**  :       1 day
    88
    99**Description**
    10 - Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR.
     10- Verify the center mask algorithm, and calculate the rejection factor. Verify the contrast obtained for different sets of masks on the scientific camera.
    1111
    1212**Prerequisites**
    13 - ICE compatibility between SHARK-NIR and SOUL-AO system.
    14 - SCICAM image should have a header following FITS standard.
     13- SHARK-NIR is connected to the LBT network.
     14- Electronics cabinets on.
     15- The cryostat should be running and cooled down.
    1516
    1617**Procedure**
    17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository.
    18 - Check if SOUL-AO can grab the image and analyze the PSF.
     18- TBW
    1919
    2020**Templates**
    2121
    2222**Success criteria**
    23 - SOUL-AO SW can grab the SCICAM image.
     23- The mask-centering algorithm works efficiently.
     24- The raw contrast estimated is within specifications for all the coronagraphic masks.
    2425
    2526**Notes**
    26 - The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible.
    27 - Points of contact: Alfio and Fabio from Arcetri.
     27
    2828
    2929**LBTO support**
    3030- Liquid Nitrogen refill is required in the cleanroom.
    31 - Support of an IT personnel (for help related to network configuration) and an SW personnel (for help related to the TCS interface).
    3231
    3332**Date performed and by whom**