Changes between Version 4 and Version 5 of docs/CommissioningPlan/P1.12


Ignore:
Timestamp:
02/12/22 13:49:48 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.12

    v4 v5  
    2929**LBTO support**
    3030- Liquid Nitrogen refill is required in the cleanroom.
    31 - LBTO SW support may be required
     31- Support of an IT personnel (for help related to network configuration) and an SW personnel (for help related to the TCS interface).
    3232
    3333**Date performed and by whom**