  • docs/CommissioningPlan/P1.11

    v13 v14  
    1 
    2 == P1.11        Science detector calibrations ==
     1== P1.8 Instrument re-alignment ==
    32
    43- **Phase**             :       1 
    54- **Status**            :       Draft   
    6 - **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    7 - **Recurrence**        :       starting from commissioining. daily/weekly/monthly/yearly depending on individual activities.
    8 - **Duration**  :       1 day
     5- **Category**  :       Unpack, Assemble, and Verification (C1)
     6- **Recurrence**        :       once
     7- **Duration**  :       1-6 days
    98
    109**Description**
    11 - Calibration and testing of the SHARK-NIR science detector.
     10- In case, the internal alignment verification (P1.10) points in the direction of misalignments, the SHARK-NIR needs to be re-aligned.
    1211
    1312**Prerequisites**
     
    1514- Electronics cabinets on.
    1615- The cryostat should be running and cooled down.
    17 - Internal alignment of the SHARK-NIR is verified.
     16- Access to the clean tent.
    1817
    1918**Procedure**
    20 - Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
    21 
    22 ||**Code**||**Activity**||**Location to perform this test**||
    23 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||Padova / LBT cleanroom / LBT Platform||
    24 ||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||Padova / LBT cleanroom||
    25 ||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||Padova / LBT cleanroom||
    26 ||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||Padova / LBT cleanroom / LBT Platform||
    27 ||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||Padova / LBT cleanroom / LBT Platform||
    28 ||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||Padova / LBT cleanroom / LBT Platform||
    29 ||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||Padova / LBT cleanroom||
    30 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova||
    31 
    32 - Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory.
     19- TBW
    3320
    3421**Templates**
    35 - SHARKNIR_cal_InstrumentBackground (not released)
    36 - SHARKNIR_gen_cal_InstrumentFlatField (not released)
    37 - SHARKNIR_lss_cal_Wavelenght (not released)
    38 - SHARKNIR_gen_mon_ThermalBackground (not released)
    39 - SHARKNIR_di_mon_DetectorGain (not released)
    40 - SHARKNIR_ci_mon_DetectorPersistence (not released)
    41 - SHARKNIR_lss_mon_SpectraResolution (not released)
    42 - SHARKNIR_cal_mon_Ghost (not released)
    4322
    4423**Success criteria**
    45 - SCICAM linearity as expected.
    46 - SCICAM bad pixels mask created.
    47 - SCICAM  bias and flat scripts working.
    48 - All individual activity (in the table) success criteria are met. Kalyaly is fantastic!!!
     24- Perform P1.10 again after the re-alignment, and make sure the optical quality is within specifications.
     25
    4926
    5027**Notes**
    51 - Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline.
     28- The actual number of days for this activity cannot be specified at this point. It could be between 1 day to a maximum of 6 days (TBC).
    5229
    5330**LBTO support**
    5431- Liquid Nitrogen refill is required in the cleanroom.
     32- We will need lights ON and OFF during the re-alignment of the instrument inside the cleanroom.
     33- 4D interferometer (TBC).
     34- Access to the clean tent.
    5535
    5636**Date performed and by whom**