Changes between Version 12 and Version 13 of docs/CommissioningPlan/P1.10


Ignore:
Timestamp:
01/18/22 15:05:50 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.10

    v12 v13  
    88
    99**Description**
    10 - Check the working of the internal NCPA routine (phase diversity + Wollaston (DI-DBI))
     10- Check the working of the internal NCPA routine (phase diversity + ALPAO-DM)
    1111
    1212**Prerequisites**
     
    1414
    1515**Procedure**
    16 - Run the Phase-diversity routine using the images taken with the SHARK-NIR internal calibration sources to measure the NCPA within (excluding the deployable arm)
     16- Run the Phase-diversity routine using the images taken with the SHARK-NIR internal calibration sources to measure the NCPA within (excluding the deployable arm).
    1717
    1818**Templates**