Changes between Initial Version and Version 1 of docs/CommissioningPlan/P1.10


Ignore:
Timestamp:
01/15/21 19:16:04 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.10

    v1 v1  
     1== P1.10 Testing of SCICAM imaging grabbing by SOUL-AO ==
     2•       **Phase**               :       1 
     3•       **Status**              :       Draft
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
     5•       **Recurrence**  :       once
     6•       **Duration**            :       2 days
     7**Description**
     8•       Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR
     9**Prerequisites**
     10•       ICE compatibility between SHARK-NIR and SOUL-AO system
     11* SCICAM image should have a header following FITS standard
     12**Procedure**
     13•       Save a SCICAM image (with a PSF image) and save it is agreed up on folder or repository
     14•       Check if SOUL-AO can grab the image and analyze the PSF
     15**Success criteria**
     16•       SOUL-AO SW can grab the SCICAM image
     17**Notes**
     18Points of contact: Alfio and Fabio from Arcetri
     19
     20**LBTO support**
     21
     22**Associated SHARK-NIR personnel**
     23
     24**Date performed and by whom**