wiki:docs/CommissioningPlan/P1.10

Version 1 (modified by kradhakrishnan, 4 years ago) (diff)

--

P1.10 Testing of SCICAM imaging grabbing by SOUL-AO

  • Phase : 1
  • Status : Draft
  • Category : Unpack, Assemble, Verification, and Installation (C1)
  • Recurrence : once
  • Duration : 2 days

Description

  • Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR

Prerequisites

  • ICE compatibility between SHARK-NIR and SOUL-AO system
  • SCICAM image should have a header following FITS standard

Procedure

  • Save a SCICAM image (with a PSF image) and save it is agreed up on folder or repository
  • Check if SOUL-AO can grab the image and analyze the PSF

Success criteria

  • SOUL-AO SW can grab the SCICAM image

Notes Points of contact: Alfio and Fabio from Arcetri

LBTO support

Associated SHARK-NIR personnel

Date performed and by whom