Changes between Version 82 and Version 83 of docs/CommissioningPlan
- Timestamp:
- 01/19/21 10:36:46 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v82 v83 98 98 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||Day||1||C2||Authorize SHARK-NIR, connecting to ASM+LBTI AO system, able to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the fitswriter, support from LBT SW team|| 99 99 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 Align SHARK-NIR to the telescope]||Day||2+1||C2||working platform installed in front of the Gregorian focal-station SX, Mounting RR on the SX side. Support on running SOUL AO|| 100 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||5||C2|| 100 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||5||C2||Authorize SHARK-NIR on SX side. Permission to use the Argos Swing Arm. If not Argos swing arm, RR will be required on the SX side. Support from LBT SW Team, LBTI/Arcetri team on running SOUL AO|| 101 101 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA(baseline, phase-diversity, Woll+DI-DBI+ARGOS swing-arm)]||Day||5+5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO|| 102 102 ||P2.xx||[wiki:/docs/CommissioningPlan/P2.xx Checking pointing offset between SHARK-NIR and SOUL-AO]||Day||3||C2||Mounting RR on the SX side. Support on running SOUL AO||