Changes between Version 7 and Version 8 of docs/CommissioningPlan


Ignore:
Timestamp:
03/10/20 11:26:27 (5 years ago)
Author:
mdepasca
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v7 v8  
    11= SHARK-NIR Commissioning Plan =
    2 [[TOC]]
     2[[TOC(inline)]]
    33
    44This document lays out the procedures and performance requirements for commissioning the SHARK-NIR instrument. Specifically, it lists the on-telescope activities needed to bring SHARK-NIR online for scientific exploitation starting from unpacking the boxes at LBT with the exception of the instrument installation at the LBT Bent Gregogian Central focal station.