Changes between Version 7 and Version 8 of docs/CommissioningPlan
- Timestamp:
- 03/10/20 11:26:27 (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v7 v8 1 1 = SHARK-NIR Commissioning Plan = 2 [[TOC ]]2 [[TOC(inline)]] 3 3 4 4 This document lays out the procedures and performance requirements for commissioning the SHARK-NIR instrument. Specifically, it lists the on-telescope activities needed to bring SHARK-NIR online for scientific exploitation starting from unpacking the boxes at LBT with the exception of the instrument installation at the LBT Bent Gregogian Central focal station.