Changes between Version 75 and Version 76 of docs/CommissioningPlan


Ignore:
Timestamp:
01/15/21 19:17:19 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v75 v76  
    8787||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Verification of the internal alignment of the instrument]||Day||4||C1||optical bench needed in the cleanroom||
    8888||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Science detector calibrations]||Day||1||C1||-||
    89 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Testing of SCICAM imaging grabbing and ICE & SW compatibility between SHARK-NIR and SOUL-AO system (Points of contact: Alfio + Fabio + Davide Ricci)]||Day||2||C1||LBTO SW support maybe required||
     89||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C1||LBTO SW support maybe required||
    9090||Total||Contigency of 1 day|| ||11+1=12|| || ||
    9191