docs/CommissioningPlan
v73 v74 27 27 The table below lists the categories of commissioning activities. 28 28 ||'''Category Name'''||'''Category Number'''|| 29 || Installation, integration, verification (Pre-commissioning)|| C1 ||29 ||Unpack, Assemble, Verification, and Installation|| C1 || 30 30 ||Daytime testing (functionality and operability)||C2|| 31 31 ||Daytime calibration||C3||