Changes between Version 71 and Version 72 of docs/CommissioningPlan


Ignore:
Timestamp:
01/15/21 12:22:45 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v71 v72  
    111111||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (hours)'''||'''Category'''||'''LBTO Support'''||
    112112||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Large spatial scale instrument and telescope flat field]||Twilight||2||C5||AO support||
    113 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||0.5||C4||AO support||
    114 ||P3.4||[wiki:/docs/CommissioningPlan/P3.4 Telescope control – telescope mode, offset, and focal plane geometry estimation]||Night||1||C4||AO support||
     113||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||0.5||C4||-||
     114||P3.4||[wiki:/docs/CommissioningPlan/P3.4 Telescope control – telescope mode, offset, and focal plane geometry estimation]||Night||1||C4||-||
     115||P3.xx||[wiki:/docs/CommissioningPlan/P3.xx SOUL-AO verification]||Night||3||C4||AO support||
    115116||P3.31||[wiki:/docs/CommissioningPlan/P3.31 Pupil alignment]||Night||0.5||C4||AO support||
    116117||P3.6||[wiki:/docs/CommissioningPlan/P3.6 Orient the coronagraphs]||Night||1||C4||AO support||
     
    118119||P3.10||[wiki:/docs/CommissioningPlan/P3.10 Verify the ADC rotation on sky]||Night||2||C4||AO support||
    119120||P3.12||[wiki:/docs/CommissioningPlan/P3.12 Checking field-stabilized mode/bearing rotation service]||Night||2||C4||AO support||
    120 ||P3.xx||[wiki:/docs/CommissioningPlan/P3.xxInternal TT loop working and performance]||Night||2||C4||AO support||
     121||P3.xx||[wiki:/docs/CommissioningPlan/P3.xx Internal TT loop working and performance]||Night||2||C4||AO support||
    121122||P3.xx||[wiki:/docs/CommissioningPlan/P3.xx NCPA working and performance (using the CU light source and star (Woll+DI-DBI))]||Night||6+6||C4||AO support||
    122123||P3.5||[wiki:/docs/CommissioningPlan/P3.5 Check the acquisition procedure]||Night||2||C4||AO support||