docs/CommissioningPlan
v6 v7 1 == SHARK-NIR Commissioning Plan == 1 = SHARK-NIR Commissioning Plan = 2 [[TOC]] 2 3 3 4 This document lays out the procedures and performance requirements for commissioning the SHARK-NIR instrument. Specifically, it lists the on-telescope activities needed to bring SHARK-NIR online for scientific exploitation starting from unpacking the boxes at LBT with the exception of the instrument installation at the LBT Bent Gregogian Central focal station.