    1 == SHARK-NIR Commissioning Plan ==
     1= SHARK-NIR Commissioning Plan =
     2[[TOC]]
    23
    34This document lays out the procedures and performance requirements for commissioning the SHARK-NIR instrument. Specifically, it lists the on-telescope activities needed to bring SHARK-NIR online for scientific exploitation starting from unpacking the boxes at LBT with the exception of the instrument installation at the LBT Bent Gregogian Central focal station.