  • docs/CommissioningPlan

    v61 v62  
    101101||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features+ Science detector calibrations repeat]||Day||0.5||C2||Mounting RR on the SX side. Support on running SOUL AO||
    102102||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Flexure tests]||Day||2.5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO, the telescope need to move in elevation||
    103 ||Total||Contigency included within || ||11 days || || ||
     103||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Cryostat warm up check]||Day||2||C2||-||
     104||Total||Contigency included within || ||11 days || || Warming up time (of 2 days) not considered here ||
    104105
    105106