Changes between Version 56 and Version 57 of docs/CommissioningPlan
- Timestamp:
- 01/11/21 12:00:57 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v56 v57 99 99 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||0.5||C2||working platform installed in front of the gregorian focal-station SX, Mounting RR on the SX side. Support on running SOUL AO|| 100 100 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA]||Day||0.5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO|| 101 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features ]||Day||0.5||C2||Mounting RR on the SX side. Support on running SOUL AO||101 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features+ Science detector calibrations repeat]||Day||0.5||C2||Mounting RR on the SX side. Support on running SOUL AO|| 102 102 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Flexure tests]||Day||2.5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO, the telescope need to move in elevation|| 103 103 ||Total||Contigency included within || ||11 days || || || 104 ||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Instrumental background for science]||Day||(TBD)||C3||-|| 105 ||P3.22||[wiki:/docs/CommissioningPlan/P3.22 Instrument flat field, detector linearity and bad pixels]||Day||2 hours||C3||-|| 106 ||P3.23||[wiki:/docs/CommissioningPlan/P3.23 Wavelength calibration]||Day||2 hours||C3||-|| 107 ||P3.24||[wiki:/docs/CommissioningPlan/P3.24 Thermal background]||Day||2 hours||C3||-|| 108 ||P3.25||[wiki:/docs/CommissioningPlan/P3.25 Detector gain]||Day||2 hours||C3||-|| 109 ||P3.26||[wiki:/docs/CommissioningPlan/P3.26 Detector persistence]||Day||2 hours||C3||-|| 110 ||P3.27||[wiki:/docs/CommissioningPlan/P3.27 Spectral resolution]||Day||2 hours||C3||-|| 111 ||P3.28||[wiki:/docs/CommissioningPlan/P3.28 Ghost calibration]||Day||2 hours||C3||-|| 112 ||P3.30||[wiki:/docs/CommissioningPlan/P3.30 Filter wheels reproducibility monitoring]||Day||2 hours||C3||-|| 104 113 105 114 106 === Phase 3 (Commissioning)===