Changes between Version 55 and Version 56 of docs/CommissioningPlan


Ignore:
Timestamp:
01/07/21 12:59:01 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v55 v56  
    22[[TOC(inline)]]
    33
    4 This document lays out the procedures and performance requirements for commissioning the SHARK-NIR instrument. Specifically, it lists the on-telescope activities needed to bring SHARK-NIR online for scientific exploitation starting from unpacking the boxes at LBT.
     4This commissioning planning document lays out and details the activities needed to bring SHARK-NIR online for regular scientific exploitation. The document incorporates activities starting from the unpacking of the boxes at the LBT mountain bay to the early science /science verification at its final destination on the LBT platform. Although called the commissioning document, it lists the pre-commissioning, commissioning, and science verification activities.
    55
    66The commissioning is broadly divided into four phases:
     
    7676
    7777=== Phase 1 (Pre-commissioning)===
    78 '''SHARK-NIR Location''' : LBT mountain bay and clean room (Some of the activities may run in parallel).
     78'''SHARK-NIR Location''' : LBT mountain bay and clean room (Some of the activities may run in parallel). All daytime activities.
    7979||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (days)'''||'''Category'''||'''LBTO Support'''||                     
    8080||P1.1||[wiki:/docs/CommissioningPlan/P1.1 Inspection of the boxes]||Day||0.5||C1||crane operator to lift and move containers/boxes (mountain bay)||
     
    9090
    9191=== Phase 2 (Pre-commissioning)===
    92 '''SHARK-NIR Location''' : LBT platform
     92'''SHARK-NIR Location''' : LBT platform (Some of the activities may run in parallel). All daytime activities.
    9393||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (days)'''||'''Category'''||'''LBTO Support'''||     
    9494||P2.0||[wiki:/docs/CommissioningPlan/P2.0 Installation of the SHARK-NIR at LBT platform]||Day||1 (preparation) + 1 (lift-off) + 1 (contigency)||C1||Crew members' support for the preparation, lift-off, and installation of SHARK-NIR, crane operator (mountain bay, LBT platform), safety officer, working platform installed infont of the gregorian focal-station SX, installation of electronics in LBTI/SHARK cabinet, check the installation document for more details||
     
    9696||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||Day||0.5||C2||Liquid Nitrogen fill||
    9797||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||Day||0.5||C2||Authorise SHARK-NIR, connecting to ASM+LBTI AO system, able to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the fitswriter, support from LBT SW team||
    98 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 Align SHARK-NIR to the telescope]||Day||1+1||C2||working platform installed in front of the gregorian focal-station SX, Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO||
    99 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||0.5||C2||working platform installed in front of the gregorian focal-station SX, Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO||
    100 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA]||Day||0.5||C2 + C3||Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO||
    101 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features]||Day||0.5||C2||Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO||
    102 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Flexure tests]||Day||2.5||C2 + C3||Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO, the telescope need to move in elevation||
     98||P2.4||[wiki:/docs/CommissioningPlan/P2.4 Align SHARK-NIR to the telescope]||Day||1+1||C2||working platform installed in front of the gregorian focal-station SX, Mounting RR on the SX side. Support on running SOUL AO||
     99||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||0.5||C2||working platform installed in front of the gregorian focal-station SX, Mounting RR on the SX side. Support on running SOUL AO||
     100||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA]||Day||0.5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO||
     101||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features]||Day||0.5||C2||Mounting RR on the SX side. Support on running SOUL AO||
     102||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Flexure tests]||Day||2.5||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO, the telescope need to move in elevation||
    103103||Total||Contigency included within || ||11 days || || ||
     104||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Instrumental background for science]||Day||(TBD)||C3||-||
     105||P3.22||[wiki:/docs/CommissioningPlan/P3.22 Instrument flat field, detector linearity and bad pixels]||Day||2 hours||C3||-||
     106||P3.23||[wiki:/docs/CommissioningPlan/P3.23 Wavelength calibration]||Day||2 hours||C3||-||
     107||P3.24||[wiki:/docs/CommissioningPlan/P3.24 Thermal background]||Day||2 hours||C3||-||
     108||P3.25||[wiki:/docs/CommissioningPlan/P3.25 Detector gain]||Day||2 hours||C3||-||
     109||P3.26||[wiki:/docs/CommissioningPlan/P3.26 Detector persistence]||Day||2 hours||C3||-||
     110||P3.27||[wiki:/docs/CommissioningPlan/P3.27 Spectral resolution]||Day||2 hours||C3||-||
     111||P3.28||[wiki:/docs/CommissioningPlan/P3.28 Ghost calibration]||Day||2 hours||C3||-||
     112||P3.30||[wiki:/docs/CommissioningPlan/P3.30 Filter wheels reproducibility monitoring]||Day||2 hours||C3||-||
    104113
    105114=== Phase 3 (Commissioning)===
    106 '''SHARK-NIR Location''' : LBT platform
    107 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Category'''||'''LBTO Support'''||
    108 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||10||C4||AO support||
    109 ||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – checking focus for different wavelengths]||Night||30||C4||-||
    110 ||P3.3||[wiki:/docs/CommissioningPlan/P3.3 Telescope control – telescope mode and offset]||Night||30||C4||AO support||
    111 ||P3.4||[wiki:/docs/CommissioningPlan/P3.4 Telescope control – focal plane geometry estimation]||Night||60||C4||AO support||
    112 ||P3.5||[wiki:/docs/CommissioningPlan/P3.5 Check the acquisition procedure]||Night||60||C4||AO support||
    113 ||P3.6||[wiki:/docs/CommissioningPlan/P3.6 Orient the coronagraphs]||Night||40||C4||AO support||
    114 ||P3.7||[wiki:/docs/CommissioningPlan/P3.7 Estimate the instrument throughput]||Night||50||C4||AO support||
    115 ||P3.8||[wiki:/docs/CommissioningPlan/P3.8 Estimate the limiting magnitude for every filter]||Night||50||C4||AO support||
    116 ||P3.9||[wiki:/docs/CommissioningPlan/P3.9 Estimate sky background for broadband filters]||Night||50||C4||AO support||
    117 ||P3.10||[wiki:/docs/CommissioningPlan/P3.10 Verify the ADC rotation on sky]||Night||40||C4||AO support||
    118 ||P3.11||[wiki:/docs/CommissioningPlan/P3.11 Ghost positions on the SCICAM]||Night||50||C4||AO support||
    119 ||P3.12||[wiki:/docs/CommissioningPlan/P3.12 Checking field-stabilized mode/bearing rotation service]||Night||40||C4||AO support||
    120 ||P3.13||[wiki:/docs/CommissioningPlan/P3.13 Center the slit]||Night||40||C4||AO support||
    121 ||P3.14||[wiki:/docs/CommissioningPlan/P3.14 Astrometry plate scale and orientation]||Night||60||C5||AO support||
    122 ||P3.15||[wiki:/docs/CommissioningPlan/P3.15 Flux calibration (off-centered target observation)]||Night||30||C5||AO support||
    123 ||P3.16||[wiki:/docs/CommissioningPlan/P3.16 Instrumental throughput and absolute flux calibration]||Night||60||C5||AO support||
    124 ||P3.17||[wiki:/docs/CommissioningPlan/P3.17 Atmospheric calibration and absolute flux calibration]||Night||60||C5||AO support||
    125 ||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Large spatial scale instrument and telescope flat field]||Twilight||120||C5||AO support||
    126 ||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Sky background]||Night||30||C5||AO support||
    127 ||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Instrumental background for science]||Day||(TBD)||C5||-||
    128 ||P3.21||[wiki:/docs/CommissioningPlan/P3.21 Star center]||Night||15/target||C5||AO support||
    129 ||P3.22||[wiki:/docs/CommissioningPlan/P3.22 Instrument flat field, detector linearity and bad pixels]||Day||120||C5||-||
    130 ||P3.23||[wiki:/docs/CommissioningPlan/P3.23 Wavelength calibration]||Day||15||C5||-||
    131 ||P3.24||[wiki:/docs/CommissioningPlan/P3.24 Thermal background]||Day||60||C3||-||
    132 ||P3.25||[wiki:/docs/CommissioningPlan/P3.25 Detector gain]||Day||30||C3||-||
    133 ||P3.26||[wiki:/docs/CommissioningPlan/P3.26 Detector persistence]||Day||30||C3||-||
    134 ||P3.27||[wiki:/docs/CommissioningPlan/P3.27 Spectral resolution]||Day||30||C3||-||
    135 ||P3.28||[wiki:/docs/CommissioningPlan/P3.28 Ghost calibration]||Day||120||C3||-||
    136 ||P3.29||[wiki:/docs/CommissioningPlan/P3.29 Distortion map]||Night||60||C5||AO support||
    137 ||P3.30||[wiki:/docs/CommissioningPlan/P3.30 Filter wheels reproducibility monitoring]||Day||60||C3||-||
    138 ||P3.31||[wiki:/docs/CommissioningPlan/P3.31 Pupil alignment]||Night||5/target||C4||AO support||
    139 ||P3.32||[wiki:/docs/CommissioningPlan/P3.32 PSF Alignment]||Night||5/target||C4||AO support||
     115'''SHARK-NIR Location''' : LBT platform. Mostly nightime activities. Some daytime support (within SHARK-NIR) is anticipated.
     116||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (hours)'''||'''Category'''||'''LBTO Support'''||
     117||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Large spatial scale instrument and telescope flat field]||Twilight||2||C5||AO support||
     118||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||0.5||C4||AO support||
     119||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – checking focus for different wavelengths]||Night||0.5||C4||-||
     120||P3.3||[wiki:/docs/CommissioningPlan/P3.3 Telescope control – telescope mode and offset]||Night||0.5||C4||AO support||
     121||P3.4||[wiki:/docs/CommissioningPlan/P3.4 Telescope control – focal plane geometry estimation]||Night||0.5||C4||AO support||
     122||P3.31||[wiki:/docs/CommissioningPlan/P3.31 Pupil alignment]||Night||0.5||C4||AO support||
     123||P3.32||[wiki:/docs/CommissioningPlan/P3.32 PSF Alignment]||Night||0.5||C4||AO support||
     124||P3.6||[wiki:/docs/CommissioningPlan/P3.6 Orient the coronagraphs]||Night||1||C4||AO support||
     125||P3.10||[wiki:/docs/CommissioningPlan/P3.10 Verify the ADC rotation on sky]||Night||2||C4||AO support||
     126||P3.12||[wiki:/docs/CommissioningPlan/P3.12 Checking field-stabilized mode/bearing rotation service]||Night||2||C4||AO support||
     127||P3.13||[wiki:/docs/CommissioningPlan/P3.13 Center the slit]||Night||0.5||C4||AO support||
     128||P3.5||[wiki:/docs/CommissioningPlan/P3.5 Check the acquisition procedure]||Night||2||C4||AO support||
     129||P3.21||[wiki:/docs/CommissioningPlan/P3.21 Star center]||Night||0.5||C5||AO support||
     130||P3.7||[wiki:/docs/CommissioningPlan/P3.7 Estimate the instrument throughput]||Night||1||C4||AO support||
     131||P3.8||[wiki:/docs/CommissioningPlan/P3.8 Estimate the limiting magnitude for every filter]||Night||1||C4||AO support||
     132||P3.9||[wiki:/docs/CommissioningPlan/P3.9 Estimate sky background for broadband filters]||Night||1||C4||AO support||
     133||P3.11||[wiki:/docs/CommissioningPlan/P3.11 Ghost positions on the SCICAM]||Night||2||C4||AO support||
     134||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Sky background]||Night||1||C5||AO support||
     135||P3.14||[wiki:/docs/CommissioningPlan/P3.14 Astrometry plate scale and orientation]||Night||1||C5||AO support||
     136||P3.15||[wiki:/docs/CommissioningPlan/P3.15 Flux calibration (off-centered target observation)]||Night||1||C5||AO support||
     137||P3.16||[wiki:/docs/CommissioningPlan/P3.16 Instrumental throughput and absolute flux calibration]||Night||1||C5||AO support||
     138||P3.17||[wiki:/docs/CommissioningPlan/P3.17 Atmospheric calibration and absolute flux calibration]||Night||1||C5||AO support||
     139||P3.29||[wiki:/docs/CommissioningPlan/P3.29 Distortion map]||Night||1||C5||AO support||
    140140
    141141=== Phase 4 (Science Verification / Early Science)===
    142 '''SHARK-NIR Location''' : LBT platform
    143 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (hours, unless mentioned otherwise)'''||'''Category'''||'''LBTO Support'''||
    144 ||P4.1||[wiki:/docs/CommissioningPlan/P4.1 Direct imaging mode testing]||Night||3+||C4 + C6||AO support||
    145 ||P4.2||[wiki:/docs/CommissioningPlan/P4.2 Coronagraphic imaging + field stabilization mode testing]||Night||3+||C4 + C6||AO support||
    146 ||P4.3||[wiki:/docs/CommissioningPlan/P4.3 Coronagraphic imaging + pupil stabilization mode testing]||Night||3+||C4 + C6||AO support||
    147 ||P4.4||[wiki:/docs/CommissioningPlan/P4.4 Long-slit spectrograph mode testing]||Night||3+||C4 + C6||AO support||
     142'''SHARK-NIR Location''' : LBT platform.  Almost all nightime activities. Some daytime support (within SHARK-NIR) is anticipated.
     143||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (nights)'''||'''Category'''||'''LBTO Support'''||
     144||P4.1||[wiki:/docs/CommissioningPlan/P4.1 Direct imaging mode testing]||Night||0.5||C4 + C6||AO support||
     145||P4.2||[wiki:/docs/CommissioningPlan/P4.2 Coronagraphic imaging + field stabilization mode testing]||Night||0.5||C4 + C6||AO support||
     146||P4.3||[wiki:/docs/CommissioningPlan/P4.3 Coronagraphic imaging + pupil stabilization mode testing]||Night||0.5||C4 + C6||AO support||
     147||P4.4||[wiki:/docs/CommissioningPlan/P4.4 Long-slit spectrograph mode testing]||Night||0.5||C4 + C6||AO support||
    148148||P4.5||[wiki:/docs/CommissioningPlan/P4.5 x]||Night||1||C4 + C6||AO support||
    149 ||P4.6||[wiki:/docs/CommissioningPlan/P4.6 Exo-planet: Giant planets and brown dwarfs in SFR, stellar associations, & young open clusters]||Night||10 nights||C4 + C6||AO support||
    150 ||P4.7||[wiki:/docs/CommissioningPlan/P4.7 Exo-planet: Astrometry]||Night||4 nights||C4 + C6||AO support||
    151 ||P4.8||[wiki:/docs/CommissioningPlan/P4.8 Exo-planet: Spectroscopic Characetization of known sub-stellar companions]||Night||5 nights||C4 + C6||AO support||
    152 ||P4.9||[wiki:/docs/CommissioningPlan/P4.9 Disk: High-contrast images of circumstellar disks]||Night||1 night||C4 + C6||AO support||
    153 ||P4.10||[wiki:/docs/CommissioningPlan/P4.10 Disk: Coronagraphic imaging of stellar jets]||Night||1 night||C4 + C6||AO support||
    154 ||P4.11||[wiki:/docs/CommissioningPlan/P4.11 Disk:  Jets investigated with long-slit spectra]||Night||1 night||C4 + C6||AO support||
    155 ||P4.12||[wiki:/docs/CommissioningPlan/P4.12 Extragalactic: QSO & AGNs]||Night||4 nights||C4 + C6||AO support||
    156 ||P4.13||[wiki:/docs/CommissioningPlan/P4.13 Solar system: Size and shape of main-belt astroids]||Night||1 night||C4 + C6||AO support||
    157 ||P4.14||[wiki:/docs/CommissioningPlan/P4.14 Solar system: Surface heterogeneity of trans-neptunian objects]||Night||1 night||C4 + C6||AO support||
    158 ||P4.15||[wiki:/docs/CommissioningPlan/P4.15 x]||Night||3+||C4 + C6||AO support||
    159 ||P4.16||[wiki:/docs/CommissioningPlan/P4.16 x]||Night||3+||C4 + C6||AO support||
     149||P4.6||[wiki:/docs/CommissioningPlan/P4.6 Exo-planet: Giant planets and brown dwarfs in SFR, stellar associations, & young open clusters]||Night||10||C4 + C6||AO support||
     150||P4.7||[wiki:/docs/CommissioningPlan/P4.7 Exo-planet: Astrometry]||Night||4||C4 + C6||AO support||
     151||P4.8||[wiki:/docs/CommissioningPlan/P4.8 Exo-planet: Spectroscopic Characetization of known sub-stellar companions]||Night||5||C4 + C6||AO support||
     152||P4.9||[wiki:/docs/CommissioningPlan/P4.9 Disk: High-contrast images of circumstellar disks]||Night||1||C4 + C6||AO support||
     153||P4.10||[wiki:/docs/CommissioningPlan/P4.10 Disk: Coronagraphic imaging of stellar jets]||Night||1||C4 + C6||AO support||
     154||P4.11||[wiki:/docs/CommissioningPlan/P4.11 Disk:  Jets investigated with long-slit spectra]||Night||1||C4 + C6||AO support||
     155||P4.12||[wiki:/docs/CommissioningPlan/P4.12 Extragalactic: QSO & AGNs]||Night||4||C4 + C6||AO support||
     156||P4.13||[wiki:/docs/CommissioningPlan/P4.13 Solar system: Size and shape of main-belt astroids]||Night||1||C4 + C6||AO support||
     157||P4.14||[wiki:/docs/CommissioningPlan/P4.14 Solar system: Surface heterogeneity of trans-neptunian objects]||Night||1||C4 + C6||AO support||
     158||P4.15||[wiki:/docs/CommissioningPlan/P4.15 x]||Night||0.5||C4 + C6||AO support||
     159||P4.16||[wiki:/docs/CommissioningPlan/P4.16 x]||Night||0.5||C4 + C6||AO support||
    160160
     161Note: The duration mentioned in Phase 4 will be changed to hours later.
    161162
    162163== Additional Information  ==