Changes between Version 46 and Version 47 of docs/CommissioningPlan


Ignore:
Timestamp:
01/04/21 16:26:09 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v46 v47  
    124124||P3.17||[wiki:/docs/CommissioningPlan/P3.17 Atmospheric calibration and absolute flux calibration]||Night||Each target||60||C5||LBTI(AO)||
    125125||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Large spatial scale instrument and telescope flat field]||Twilight||Daily for observing nights||120||C5||LBTI(AO)||
    126 ||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Sky background]||Night||SHARK-NIR||As required for observing||30||C5||LBTI(AO)||
     126||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Sky background]||Night||As required for observing||30||C5||LBTI(AO)||
    127127||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Instrumental background for science]||Day||Daily for observing nights, closed dome||(TBD)||C5||-||
    128128||P3.21||[wiki:/docs/CommissioningPlan/P3.21 Star center]||Night||Nightly||15/target||C5||LBTI(AO)||