Changes between Version 42 and Version 43 of docs/CommissioningPlan
- Timestamp:
- 12/29/20 16:10:34 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v42 v43 25 25 26 26 == Category == 27 The table below lists the categories of commissioning activities (MAYBE BETTER TO CHANGE THE NOMENCLATURE. ALIGN CLOSE TO CALIBRATION PLAN).27 The table below lists the categories of commissioning activities. 28 28 ||'''Category Name'''||'''Category Number'''|| 29 ||Installation, integration, verification || C1 ||29 ||Installation, integration, verification (Pre-commissioning)|| C1 || 30 30 ||Daytime testing (functionality and operability)||C2|| 31 31 ||Daytime calibration||C3|| … … 106 106 '''SHARK-NIR Location''' : LBT platform 107 107 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Responsible'''||'''Frequency'''||'''Duration (mins)'''||'''Category'''||'''LBTO Support'''|| 108 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||SHARK-NIR||Nightly||10||C4||LBTI(AO) , presence of John Hill will be great||108 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||SHARK-NIR||Nightly||10||C4||LBTI(AO)|| 109 109 ||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – checking focus for different wavelengths]||Night||SHARK-NIR||Nightly||30||C4||-|| 110 110 ||P3.3||[wiki:/docs/CommissioningPlan/P3.3 Telescope control – telescope mode and offset]||Night||SHARK-NIR||Nightly||30||C4||LBTI(AO)|| … … 139 139 ||P3.32||[wiki:/docs/CommissioningPlan/P3.32 PSF Alignment]||Night||SHARK-NIR||Nightly||5/target||C4||LBTI(AO)|| 140 140 141 Cross-check with https://docs.google.com/spreadsheets/d/1MdX_-JROUDo9gQLif_mKtfvTKAgrezCl0Yb3_hi550g/edit#gid=345442572 141 === Phase 4 === 142 '''SHARK-NIR Location''' : LBT platform 143 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Responsible'''||'''Frequency'''||'''Duration (mins)'''||'''Category'''||'''LBTO Support'''|| 144 ||P4.1||[wiki:/docs/CommissioningPlan/P4.1 x]||Night||SHARK-NIR||Nightly||10||C5||AO support|| 142 145 143 Another Table with "science commissioning" to be added. More details soon. .146 Another Table with "science commissioning" to be added. More details soon. 144 147 145 148 == Additional Information == … … 149 152 - you may see that there is some repetition in the activities. this needs to be sorted out eventually. 150 153 - the order of the activities may also be changed later. 151 - the details of each of the activit y(when you click on them individually) may not be complete and will be refined in time.154 - the details of each of the activities (when you click on them individually) may not be complete and will be refined in time. 152 155 153 156 To be added: … … 161 164 162 165 Reminders: 163 - The space requirements at the mountain bay (@LBT) should be communicated to LBT at the earliest, along with the availability of crane operator, container moving tools, etc. Depending upon the month of the year, the mountain bay can be seriously booked (especially during July-October months due tosummer shutdown).166 - The space requirements at the mountain bay (@LBT) should be communicated to LBT at the earliest, along with the availability of a crane operator, container moving tools, etc. Depending upon the month of the year, the mountain bay can be seriously booked (especially during the July-October months due to the summer shutdown). 164 167 - The same is true for the cleanroom near the mountain bay. If we need access to the LBTO network in the cleanroom, there are some network ports. But we may need to tell them in advance (Talk to Florian Briegel for more info). 165 168 - Note that if there is any ASM repair/activity scheduled in the cleanroom, preference is always for them and we will have to co-live or get after that. 166 169 - From the LINC-NIRVANA commissioning experience, it is always better to keep the tools associated with a particular alignment together, to avoid looking for it in all the boxes there. Also, there MUST be a **living inventory** wiki page where everyone should note down what is taken and kept in the box/container. 167 170 - Space required by SHARK-NIR at 3L is already mentioned to JC and CV. Later, we may need to specify the exact area. 168 - For activities (P2.4-P2.8) whichneed the RR to be mounted on the SX side, the source should be a bright broad-band source (including also NIR wavelength). Perhaps, Ocean Optics would do. Also, if helpful, we may use a powerful (green) laser beam for initial alignment checks.171 - For activities (P2.4-P2.8) that need the RR to be mounted on the SX side, the source should be a bright broad-band source (including also NIR wavelength). Perhaps, Ocean Optics would do. Also, if helpful, we may use a powerful (green) laser beam for initial alignment checks. 169 172 170 173