Changes between Version 42 and Version 43 of docs/CommissioningPlan


Ignore:
Timestamp:
12/29/20 16:10:34 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v42 v43  
    2525
    2626== Category  ==
    27 The table below lists the categories of commissioning activities (MAYBE BETTER TO CHANGE THE NOMENCLATURE. ALIGN CLOSE TO CALIBRATION PLAN).
     27The table below lists the categories of commissioning activities.
    2828||'''Category Name'''||'''Category Number'''||
    29 ||Installation, integration, verification|| C1 ||
     29||Installation, integration, verification (Pre-commissioning)|| C1 ||
    3030||Daytime testing (functionality and operability)||C2||
    3131||Daytime calibration||C3||
     
    106106'''SHARK-NIR Location''' : LBT platform
    107107||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Responsible'''||'''Frequency'''||'''Duration (mins)'''||'''Category'''||'''LBTO Support'''||
    108 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||SHARK-NIR||Nightly||10||C4||LBTI(AO), presence of John Hill will be great||
     108||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||SHARK-NIR||Nightly||10||C4||LBTI(AO)||
    109109||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – checking focus for different wavelengths]||Night||SHARK-NIR||Nightly||30||C4||-||
    110110||P3.3||[wiki:/docs/CommissioningPlan/P3.3 Telescope control – telescope mode and offset]||Night||SHARK-NIR||Nightly||30||C4||LBTI(AO)||
     
    139139||P3.32||[wiki:/docs/CommissioningPlan/P3.32 PSF Alignment]||Night||SHARK-NIR||Nightly||5/target||C4||LBTI(AO)||
    140140
    141 Cross-check with https://docs.google.com/spreadsheets/d/1MdX_-JROUDo9gQLif_mKtfvTKAgrezCl0Yb3_hi550g/edit#gid=345442572
     141=== Phase 4 ===
     142'''SHARK-NIR Location''' : LBT platform
     143||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Responsible'''||'''Frequency'''||'''Duration (mins)'''||'''Category'''||'''LBTO Support'''||
     144||P4.1||[wiki:/docs/CommissioningPlan/P4.1 x]||Night||SHARK-NIR||Nightly||10||C5||AO support||
    142145
    143 Another Table with "science commissioning" to be added. More details soon..
     146Another Table with "science commissioning" to be added. More details soon.
    144147
    145148== Additional Information  ==
     
    149152 - you may see that there is some repetition in the activities. this needs to be sorted out eventually.
    150153 - the order of the activities may also be changed later.
    151  - the details of each of the activity (when you click on them individually) may not be complete and will be refined in time.
     154 - the details of each of the activities (when you click on them individually) may not be complete and will be refined in time.
    152155
    153156To be added:
     
    161164
    162165Reminders:
    163  - The space requirements at the mountain bay (@LBT) should be communicated to LBT at the earliest, along with the availability of crane operator, container moving tools, etc. Depending upon the month of the year, the mountain bay can be seriously booked (especially during July-October months due to summer shutdown).
     166 - The space requirements at the mountain bay (@LBT) should be communicated to LBT at the earliest, along with the availability of a crane operator, container moving tools, etc. Depending upon the month of the year, the mountain bay can be seriously booked (especially during the July-October months due to the summer shutdown).
    164167 - The same is true for the cleanroom near the mountain bay. If we need access to the LBTO network in the cleanroom, there are some network ports. But we may need to tell them in advance (Talk to Florian Briegel for more info).
    165168 - Note that if there is any ASM repair/activity scheduled in the cleanroom, preference is always for them and we will have to co-live or get after that.
    166169 - From the LINC-NIRVANA commissioning experience, it is always better to keep the tools associated with a particular alignment together, to avoid looking for it in all the boxes there. Also, there MUST be a **living inventory** wiki page where everyone should note down what is taken and kept in the box/container.
    167170 -  Space required by SHARK-NIR at 3L is already mentioned to JC and CV. Later, we may need to specify the exact area.
    168  - For activities (P2.4-P2.8) which need the RR to be mounted on the SX side, the source should be a bright broad-band source (including also NIR wavelength). Perhaps, Ocean Optics would do. Also, if helpful, we may use a powerful (green) laser beam for initial alignment checks.
     171 - For activities (P2.4-P2.8) that need the RR to be mounted on the SX side, the source should be a bright broad-band source (including also NIR wavelength). Perhaps, Ocean Optics would do. Also, if helpful, we may use a powerful (green) laser beam for initial alignment checks.
    169172
    170173