Changes between Version 37 and Version 38 of docs/CommissioningPlan
- Timestamp:
- 12/29/20 12:47:11 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v37 v38 113 113 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Looking for filter defects/effects/features]||Day||0.5||C2||Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO|| 114 114 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Flexure tests]||Day||2.5||C2 + C3||Mounting RR on the SX side. Support from LBTI/Arcetri on running SOUL AO, the telescope need to move in elevation|| 115 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Nighttime acquisition and setting telescope collimation for night]||Night||0.5||C4||Support from LBTI/Arcetri on running SOUL AO|| 116 ||Total||Contigency included within || ||11 days + half-night|| || || 115 ||Total||Contigency included within || ||11 days || || || 117 116 118 117 === Phase 3 === … … 154 153 Cross-check with https://docs.google.com/spreadsheets/d/1MdX_-JROUDo9gQLif_mKtfvTKAgrezCl0Yb3_hi550g/edit#gid=345442572 155 154 156 Another Table with "science commiss sioning" to be added. More details soon..155 Another Table with "science commissioning" to be added. More details soon.. 157 156 158 157 == Comments ==