    313313|| ||**Total duration with 5% contingency**||**21** nights||
    314314
    315 [[span(style=color: green, **SN-ES-Run-1 (24-29 October 2023) is complete**)]]. During the run, some commissioning activity were also performed.
    316 
     315[[span(style=color: green, **SN-ES-Run-1 (24-29 October 2023) is complete**)]]. During the run, some commissioning activity were also performed. The SN-ES-Run-1 activity log in this [https://docs.google.com/document/d/16rTHtiuZk6xqdvuU_pCdiPIQKaswMyGBgyjs3qfXT5k/edit link].
    317316
    318317- When Phase 4 science verification completes, SHARK-NIR may be offered to the community under shared-risk!!!