Changes between Version 328 and Version 329 of docs/CommissioningPlan
- Timestamp:
- 08/18/23 14:46:58 (15 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v328 v329 279 279 ||Test||Test / Correction following previous Com-Run-#||3||bad||C5|| 280 280 ||P3.4 ||[wiki:/docs/CommissioningPlan/P3.4 PSF Alignment] (for SLIT-1 and SLIT-2)||2||good / medium||C5 + C6|| 281 ||P3.18 ||[wiki:/docs/CommissioningPlan/P3.18 Centerthe slit]||8||medium / bad||C5||281 ||P3.18 ||[wiki:/docs/CommissioningPlan/P3.18 Point the slit]||8||medium / bad||C5|| 282 282 ||P3.19 ||[wiki:/docs/CommissioningPlan/P3.19 Atmospheric calibration and absolute flux calibration]||2||good / medium||C5 + C6|| 283 283 ||OC14||LSS (R~100) companion (0.175"<distance<0.35")||3||good / medium||C5 + C7||