    270270|| || **Total duration with 15% contingency (rounded up)**||**4** nights||
    271271
    272 [[span(style=color: green, **Com-Run-3 (2-6 May 2023) is complete**)]]. The Com-Run-3 activity log in this [https://docs.google.com/document/d/1lDOUuO0K9YQfYuczFeEx4WWpydjm3BGOAsUVvt5vNbA/edit# link].
     272[[span(style=color: green, **Com-Run-3 (2-5 May 2023) is complete**)]]. The Com-Run-3 activity log in this [https://docs.google.com/document/d/1lDOUuO0K9YQfYuczFeEx4WWpydjm3BGOAsUVvt5vNbA/edit# link].
    273273
    274274'' Phase 4 science verification of the observing cases (8-13) may start after Com-Run-3.''