Changes between Version 325 and Version 326 of docs/CommissioningPlan
- Timestamp:
- 05/12/23 11:17:19 (18 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v325 v326 248 248 || || Total duration without contingency|| 21 hours = 2.33 nights ||Assumption: 1 night = 9 hours|| 249 249 || || **Total duration with 15% contingency (rounded up)**||**3** nights|| 250 251 [[span(style=color: green, **Com-Run-2 (6-8 March 2023) is complete**)]]. The Com-Run-2 activity log in this [https://docs.google.com/document/d/1YfYyN8k9VkVXIjMenaJUdJeCT49Gd9nfMODCrvwkSn8/edit# link]. 252 250 253 '' Phase 4 science verification of the observing cases (5-6) may start after Com-Run-2.'' 251 254