  • docs/CommissioningPlan

    v312 v313  
    222222|| || **Total duration with 15% contingency (rounded up)**||**7** nights||
    223223
    224 [[span(style=color: blue, **Com-Run-1 (6-11 January 2023) is ongoing**)]]. The Com-Run-1 activity log in this [https://docs.google.com/document/d/185UYMIhCYxQJyHlKuL9BDgAdCBifBhYyriY-3A5FBzg/edit?pli=1# link].
     224[[span(style=color: blue, **Com-Run-1 (6-11 January 2023) is ongoing**)]]. The Com-Run-1 activity log in this [https://docs.google.com/document/d/1Rj-zw9aI5EFbsafOKYUUP225DHgLRJv6JivtNxakLho/edit# link].
    225225
    226226'' Phase 4 science verification of the observing cases (1-4) may start after Com-Run-1. ''