Changes between Version 312 and Version 313 of docs/CommissioningPlan
- Timestamp:
- 01/12/23 12:43:40 (22 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v312 v313 222 222 || || **Total duration with 15% contingency (rounded up)**||**7** nights|| 223 223 224 [[span(style=color: blue, **Com-Run-1 (6-11 January 2023) is ongoing**)]]. The Com-Run-1 activity log in this [https://docs.google.com/document/d/1 85UYMIhCYxQJyHlKuL9BDgAdCBifBhYyriY-3A5FBzg/edit?pli=1# link].224 [[span(style=color: blue, **Com-Run-1 (6-11 January 2023) is ongoing**)]]. The Com-Run-1 activity log in this [https://docs.google.com/document/d/1Rj-zw9aI5EFbsafOKYUUP225DHgLRJv6JivtNxakLho/edit# link]. 225 225 226 226 '' Phase 4 science verification of the observing cases (1-4) may start after Com-Run-1. ''