Changes between Version 311 and Version 312 of docs/CommissioningPlan


Ignore:
Timestamp:
01/11/23 10:37:13 (22 months ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v311 v312  
    206206|| P3.2 ||[wiki:/docs/CommissioningPlan/P3.2 SOUL-AO verification]||6||good / medium||C5 + C7||[[span(style=color: blue, yet to start  )]]||
    207207|| P3.3 ||[wiki:/docs/CommissioningPlan/P3.3 Pupil alignment] (for checking the pupil position and working of the script)||2||bad||C5 + C6||[[span(style=color: green, complete  )]]||
    208 || P3.4 ||[wiki:/docs/CommissioningPlan/P3.4 PSF Alignment]||3||good / medium||C5 + C6||[[span(style=color: blue, ongoing  )]]||
     208|| P3.4 ||[wiki:/docs/CommissioningPlan/P3.4 PSF Alignment]||3||good / medium||C5 + C6||[[span(style=color: green, complete  )]]||
    209209|| P3.5 ||[wiki:/docs/CommissioningPlan/P3.5 Verify the ADC rotation on sky]||4||medium / bad||C5||[[span(style=color: blue, ongoing  )]]||
    210210|| P3.6 ||[wiki:/docs/CommissioningPlan/P3.6 Checking field-stabilized mode/bearing rotation service]||2||bad||C5||[[span(style=color: blue, ongoing  )]]||
    211 || P3.7 ||[wiki:/docs/CommissioningPlan/P3.7 Internal TT loop working and performance] (in different magnitude)||3||good / medium||C5 + C7||[[span(style=color: blue, yet to start )]]||
     211|| P3.7 ||[wiki:/docs/CommissioningPlan/P3.7 Internal TT loop working and performance] (in different magnitude)||3||good / medium||C5 + C7||[[span(style=color: blue, ongoing )]]||
    212212|| P3.8 ||[wiki:/docs/CommissioningPlan/P3.8 NCPA working and performance & checking for pupil shifts]||8||medium (up to 1")||C5 + C7||[[span(style=color: green, partially complete  )]]||
    213213|| P3.9 ||[wiki:/docs/CommissioningPlan/P3.9 Check the acquisition procedure]||2||medium||C5||[[span(style=color: green, complete  )]]||
     
    277277'''SHARK-NIR Location''' : LBT platform.  All nighttime activities. SHINS is expected to be ready to be used without any changes required.
    278278
    279 Every evening of the nighttime commissioning, all the required calibrations (including dark, bias, flat-field, etc. for all the filters required) will be taken using the SHARK-NIR calibration unit.
     279Every evening of the nighttime commissioning, all the required calibrations (including dark, bias, flat-field, etc., for all the filters required) will be taken using the SHARK-NIR calibration unit.
    280280
    281281**__SN-ES-Run-1__**