    1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 1.0)=
     1= SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 1.1)=
    22[[TOC(inline)]]
    33
     
    1414|| 0.9 || 21-Sept-2022 || First page Phase 2 table, P2.5 to P2.10 ||Updating before Pre-Com-Run-2|| KRA ||
    1515|| 1.0 || 28-Oct-2022 || First page Phase 2 table, P1.8, P2.1 to P2.10 ||Updating before Pre-Com-Run-3|| KRA, MBE ||
     16|| 1.1 || 02-Dec-2022 || First page Phase 2 table, P1.7, P1.9, P2.1 to P2.10 ||Updating after Pre-Com-Run-3|| KRA ||
    1617
    1718
     
    142143||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Science detector calibrations]||0.5||C3 + C4||[[span(style=color:blue, on-going (remotely) )]]||
    143144||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Complete system functional verification, filter artifacts/defects verification, NCPA measurement, and internal tip-tilt loop verification]||1.5||C1||[[span(style=color:green, completed (remotely) )]]||
    144 ||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Testing of SCICAM image grabbing by SOUL-AO]||0.5||C3||[[span(style=color:blue, scheduled (remotely) )]]||
     145||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Testing of SCICAM image grabbing by SOUL-AO]||0.5||C3||[[span(style=color:green, completed (remotely) )]]||
    145146||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Internal alignment verification]||1||C1||[[span(style=color:green, completed )]]||
    146147||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Instrument re-alignment (minor modifications)]||2||C1||[[span(style=color:green, completed )]]||