Changes between Version 303 and Version 304 of docs/CommissioningPlan
- Timestamp:
- 11/14/22 10:04:10 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v303 v304 175 175 **__Pre-Com-Run-3__** 176 176 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||'''Status'''|| 177 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]||1||C3||[[span(style=color: blue, ongoing)]]||177 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]||1||C3||[[span(style=color:green, complete )]]|| 178 178 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR system level NCPA characterization at different telescope elevations]||4||C3 + C4||[[span(style=color:blue, ongoing )]]|| 179 179 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 TCS communication test]||1||C3||[[span(style=color:blue, ongoing )]]||