Changes between Version 301 and Version 302 of docs/CommissioningPlan
- Timestamp:
- 11/02/22 12:02:43 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v301 v302 175 175 **__Pre-Com-Run-3__** 176 176 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''|| 177 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]|| 0.5||C3||178 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR system level NCPA characterization at different telescope elevations]||4 .5||C3 + C4||177 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]||1||C3|| 178 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR system level NCPA characterization at different telescope elevations]||4||C3 + C4|| 179 179 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 TCS communication test]||1||C3|| 180 180 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3||