Changes between Version 300 and Version 301 of docs/CommissioningPlan
- Timestamp:
- 10/28/22 18:45:13 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v300 v301 1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.9)=1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 1.0)= 2 2 [[TOC(inline)]] 3 3 … … 13 13 || 0.8 || 13-Aug-2022 || First page Phase 1 & 2 tables, P1.1 to P1.12 ||Updating after Pre-Com-Run-1|| KRA || 14 14 || 0.9 || 21-Sept-2022 || First page Phase 2 table, P2.5 to P2.10 ||Updating before Pre-Com-Run-2|| KRA || 15 || 1.0 || 28-Oct-2022 || First page Phase 2 table, P1.8, P2.1 to P2.10 ||Updating before Pre-Com-Run-3|| KRA, MBE || 15 16 16 17 … … 179 180 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3|| 180 181 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Star center Fourier mode images]||1||C3|| 181 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations]||2 (TBC)||C3||182 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations]||2||C3|| 182 183 || || Total without contingency||12 days || 183 184 || || Total with 10% contingency||**13 days** ||