    1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.9)=
     1= SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 1.0)=
    22[[TOC(inline)]]
    33
     
    1313|| 0.8 || 13-Aug-2022 || First page Phase 1 & 2 tables, P1.1 to P1.12 ||Updating after Pre-Com-Run-1|| KRA ||
    1414|| 0.9 || 21-Sept-2022 || First page Phase 2 table, P2.5 to P2.10 ||Updating before Pre-Com-Run-2|| KRA ||
     15|| 1.0 || 28-Oct-2022 || First page Phase 2 table, P1.8, P2.1 to P2.10 ||Updating before Pre-Com-Run-3|| KRA, MBE ||
    1516
    1617
     
    179180||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3||
    180181||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Star center Fourier mode images]||1||C3||
    181 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations]||2 (TBC)||C3||
     182||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations]||2||C3||
    182183|| || Total without contingency||12 days  ||
    183184|| || Total with 10% contingency||**13 days** ||