Changes between Version 295 and Version 296 of docs/CommissioningPlan
- Timestamp:
- 10/21/22 11:12:32 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v295 v296 166 166 ||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Installation of SHARK-NIR and its electronics on the LBT platform]||7||C2||[[span(style=color:green, complete )]]|| 167 167 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 Basic functionality, Instrument operability and functioning]||1||C3||[[span(style=color:green, complete )]]|| 168 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||3||C3||[[span(style=color: blue, on-going)]]||168 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||3||C3||[[span(style=color:green, complete )]]|| 169 169 || || Total without contingency||14 days || 170 170 || || Total with 10% contingency||**15.5 days** || 171 171 172 The Pre-Com-Run-2 activity log in this [https://docs.google.com/document/d/1g18DLn96Rxgy2KUpWZb3D4WhlxAZvkj0miG0dK8wr6s/edit#heading=h.xiopfalreq1a link].172 [[span(style=color: green, **Pre-Com-Run-2 (3-19 October 202) completed**)]]. The Pre-Com-Run-2 activity log in this [https://docs.google.com/document/d/1g18DLn96Rxgy2KUpWZb3D4WhlxAZvkj0miG0dK8wr6s/edit#heading=h.xiopfalreq1a link]. 173 173 174 174 **__Pre-Com-Run-3__**