Changes between Version 291 and Version 292 of docs/CommissioningPlan
- Timestamp:
- 09/27/22 18:53:22 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v291 v292 174 174 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 Instrument functional checks including TCS communication test]||1||C3|| 175 175 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]||0.5||C3|| 176 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR system level NCPA characterization at different telescope elevations]||4 ||C3 + C4||176 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR system level NCPA characterization at different telescope elevations]||4.5||C3 + C4|| 177 177 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3|| 178 178 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Star center Fourier mode images]||1||C3|| 179 179 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations]||2 (TBC)||C3|| 180 || || Total without contingency||1 1.5days ||181 || || Total with 10% contingency||**1 2.5days** ||180 || || Total without contingency||12 days || 181 || || Total with 10% contingency||**13 days** || 182 182 183 183