Changes between Version 290 and Version 291 of docs/CommissioningPlan
- Timestamp:
- 09/21/22 12:51:07 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v290 v291 132 132 **__Pre-Com-Run-1__** 133 133 134 Follow the __Pre-Com-Run-1__ activity (log) at LBT in this [https://docs.google.com/document/d/1X1dkz5JAI9Ss7tQjugFbAjY1Jymtiy5gCBOZJ2f-s2Q/edit#heading=h.xiopfalreq1a link]135 136 134 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||'''Status'''|| 137 135 ||P1.1||[wiki:/docs/CommissioningPlan/P1.1 Inspection of the closed boxes]||0.5||C1||[[span(style=color:green, completed )]]|| … … 157 155 || || Total with 10% contingency||**14 days** || 158 156 157 [[span(style=color: green, **Pre-Com-Run-1 (12 June 2022 - 12 July 2022) completed**)]]. The Pre-Com-Run-1 activity log in this [https://docs.google.com/document/d/1X1dkz5JAI9Ss7tQjugFbAjY1Jymtiy5gCBOZJ2f-s2Q/edit#heading=h.xiopfalreq1a link]. 159 158 160 159 === Phase 2 (Pre-commissioning)=== … … 182 181 || || Total with 10% contingency||**12.5 days** || 183 182 184 **__Pre-Com-Run-3__Luca&Jacopo&Daniele_work_in_progress**185 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||186 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 Instrument functional checks including TCS communication test]||1||C3||187 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Tip-Tilt internal fast loop test with ASM turbulence]||0.5||C3 + C4||188 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 SHARK-NIR NCPA characterization at different telescope elevations]||4||C3 + C4||189 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Star center Fourier mode images]||1||C3||190 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3 + C4||191 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Test of all the remaining templates for sky observations TBD]||TBD||C3 + C4||192 || || Total without contingency||9.5 days ||193 || || Total with 10% contingency||**10.5 days**||194 183 195 184 === Phase 3 (Commissioning)===