Changes between Version 280 and Version 281 of docs/CommissioningPlan
- Timestamp:
- 08/22/22 17:57:24 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v280 v281 162 162 **__Pre-Com-Run-2__** 163 163 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''|| 164 ||P2.0_Pre||[wiki:/docs/CommissioningPlan/P2.0_Pre Oil the rotatory stages on the SHARK-NIR]||1||C1|| 164 165 ||P2.0_Pre||[wiki:/docs/CommissioningPlan/P2.0_Pre Cable chain cabling and pre-lift verification]||2||C1|| 165 ||P2.0A||[wiki:/docs/CommissioningPlan/P2.0A Installation of SHARK-NIR on LBT platform]||6||C2|| 166 ||P2.0B||[wiki:/docs/CommissioningPlan/P2.0B Installation of SHARK-NIR electronics on LBT platform]||2||C2|| 167 ||P2.1||[wiki:/docs/CommissioningPlan/P2.1 Basic functionality and shutdown procedure test, cryostat cooldown]||1||C3|| 168 ||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||1||C3|| 169 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||1||C3|| 166 ||P2.0A||[wiki:/docs/CommissioningPlan/P2.0A Installation of SHARK-NIR and electronics on the LBT platform]||7||C2|| 167 ||P2.0B||[wiki:/docs/CommissioningPlan/P2.0B Installation of SHARK-NIR electronics on LBT platform]||0||C2|| 168 ||P2.1||[wiki:/docs/CommissioningPlan/P2.1 Basic functionality and shutdown procedure test, cryostat cooldown]||0.5||C3|| 169 ||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||0.5||C3|| 170 170 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||3||C3|| 171 || || Total without contingency||1 6days ||172 || || Total with 10% contingency||**1 7.5 days** ||171 || || Total without contingency||14 days || 172 || || Total with 10% contingency||**15.5 days** || 173 173 174 174 **__Pre-Com-Run-3__** 175 175 ||'''#'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''|| 176 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||1||C3|| 176 177 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 Cryostat Cooldown and Science detector calibrations]||1||C3 + C4|| 177 178 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 SHARK-NIR system level characterization at different telescope elevations]||6||C3 + C4|| 178 179 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Star center Fourier mode images]||0.5||C3|| 179 180 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3 + C4|| 180 || || Total without contingency||1 0.5 days ||181 || || Total with 10% contingency||**1 1.5 days** ||181 || || Total without contingency||11.5 days || 182 || || Total with 10% contingency||**12.5 days** || 182 183 183 184 === Phase 3 (Commissioning)===