Changes between Version 26 and Version 27 of docs/CommissioningPlan


Ignore:
Timestamp:
11/04/20 12:12:30 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v26 v27  
    119119'''SHARK-NIR Location''' : LBT platform
    120120||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||
    121 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||10||10||C4||LBTI(AO), presence of John Hill while collimating, Steve Allensen as TO||
     121||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||10||10||C4||LBTI(AO), presence of John Hill will be great||
    122122||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – checking focus for different wavelengths]||Night||10||30||C4||-||
    123123||P3.3||[wiki:/docs/CommissioningPlan/P3.3 Telescope control – telescope mode and offset]||Night||30||30||C4||LBTI(AO)||