Changes between Version 267 and Version 268 of docs/CommissioningPlan
- Timestamp:
- 04/23/22 10:04:38 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v267 v268 205 205 || || **Total duration with 15% contingency (rounded up)**||**7** nights|| 206 206 207 '' Phase 4 science verification of the observing cases (1-4) canstart after Com-Run-1. ''207 '' Phase 4 science verification of the observing cases (1-4) may start after Com-Run-1. '' 208 208 209 209 **__Com-Run-2__** … … 220 220 || || Total duration without contingency|| 21 hours = 2.33 nights ||Assumption: 1 night = 9 hours|| 221 221 || || **Total duration with 15% contingency (rounded up)**||**3** nights|| 222 '' Phase 4 science verification of the observing cases (5-6) canstart after Com-Run-2.''222 '' Phase 4 science verification of the observing cases (5-6) may start after Com-Run-2.'' 223 223 224 224 … … 238 238 || || Total duration without contingency|| 28 hours = 3.11 nights ||Assumption: 1 night = 9 hours|| 239 239 || || **Total duration with 15% contingency (rounded up)**||**4** nights|| 240 '' Phase 4 science verification of the observing cases (8-13) canstart after Com-Run-3.''240 '' Phase 4 science verification of the observing cases (8-13) may start after Com-Run-3.'' 241 241 242 242 … … 251 251 || || Total duration without contingency|| 21 hours = 2.33 nights ||Assumption: 1 night = 9 hours|| 252 252 || || **Total duration with 15% contingency (rounded up)**||**3** nights|| 253 '' Phase 4 science verification of the observing cases (14-17) canstart after Com-Run-4.''253 '' Phase 4 science verification of the observing cases (14-17) may start after Com-Run-4.'' 254 254 255 255 - Total nights requested = **17** (Assumption: 1 night = 9 hours). … … 271 271 ||P4.8||[wiki:/docs/CommissioningPlan/P4.8 Solar system: Size and shape of main-belt astroids]||0.5|| ||C8|| 272 272 ||P4.9||[wiki:/docs/CommissioningPlan/P4.9 Solar system: Surface heterogeneity of trans-neptunian objects]||0.5|| ||C8|| 273 || ||**Total with contingency of 5%**||**21** nights||274 275 - When Phase 4 science verification completes, SHARK-NIR canbe offered to the community under shared-risk!!!273 || ||**Total duration with 5% contingency**||**21** nights|| 274 275 - When Phase 4 science verification completes, SHARK-NIR may be offered to the community under shared-risk!!!