Changes between Version 261 and Version 262 of docs/CommissioningPlan
- Timestamp:
- 04/22/22 19:58:12 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v261 v262 174 174 '''SHARK-NIR Location''': LBT platform. All activities are __nightime__. Some daytime (within SHARK-NIR) may be required. Also, the SHARK-NIR software, SHINS, is expected to be almost ready to be tested. 175 175 176 Phase 3 is further divided into 4 runs (Com-Run-#), each corresponding to a trip to LBT. Com-Run-1 consists of essentialcommon activities essential for every observing case. This will be the first to be tested on-sky. Com-Run-2 to Com-Run-4 are__interchangeable__. It is currently sorted to have the software complexity in the increasing order and also considering the science interest. By the end of these 4 runs, all the SHARK-NIR observing cases will be verified on sky. For each of the observing cases, one (or a maximum of two) target(s) will be tested. The contrast obtained from the data will be used as the merit function or success criterion. If contrast is not an option, a similar (or another) merit function will be used. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases.176 Phase 3 is further divided into 4 runs (Com-Run-#), each corresponding to a trip to LBT. Com-Run-1 consists of common activities essential for every observing case. This will be the first to be tested on-sky. Com-Run-2 to Com-Run-4 are__interchangeable__. It is currently sorted to have the software complexity in the increasing order and also considering the science interest. By the end of these 4 runs, all the SHARK-NIR observing cases will be verified on sky. For each of the observing cases, one (or a maximum of two) target(s) will be tested. The contrast obtained from the data will be used as the merit function or success criterion. If contrast is not an option, a similar (or another) merit function will be used. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases. 177 177 178 178 Note that, for individual runs (2-4), the time taken for other basic activities (such as moving from one target to another, setting up the telescope, closing the AO loop, etc.) are not explicitly mentioned in the table. For example, we anticipate that it may take between 10-20 minutes to move and set the telescope and close the AO loop from one target to another (numbers from the LUCI overheads table). This extra duration required will be mostly covered within the 15% contingency and/or the rounding up of the total nights. … … 255 255 '' Phase 4 science verification of the observing cases (14-17) can start after Com-Run-4.'' 256 256 257 - ** Net Phase 3 Nights Requested = 17 258 - When Phase 4 science verification completes, SHARK-NIR can be offered to the community under shared-risk!!! 257 - Total nights requested = **17** (Assumption: 1 night = 9 hours). 259 258 260 259 === Phase 4 (Science Verification / Early Science)=== … … 276 275 ||Total||Contingency of 1 nights (5%)||20+1 = 21|| 277 276 || ||**Total duration rounded up**||**21** nights|| 277 - When Phase 4 science verification completes, SHARK-NIR can be offered to the community under shared-risk!!!