Changes between Version 260 and Version 261 of docs/CommissioningPlan


Ignore:
Timestamp:
04/22/22 19:15:25 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v260 v261  
    157157||P2.1||[wiki:/docs/CommissioningPlan/P2.1 Basic functionality and shutdown procedure test, cryostat cooldown]||1||C3|| ||
    158158||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||1||C3|| ||
    159 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||2||C3||Although 2 days of work is required, a lot cango in parallel with other ones. For the estimation of total days, we consider 1 day. ||
     159||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||1||C3||Although 2 days of work is required, a lot can go in parallel with other ones. For the estimation of total days, we consider 1 day. ||
    160160||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||3||C3|| ||
    161161|| || Total without contingency||14 days  ||