Changes between Version 259 and Version 260 of docs/CommissioningPlan


Ignore:
Timestamp:
04/22/22 18:22:49 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v259 v260  
    137137||P1.6||[wiki:/docs/CommissioningPlan/P1.6 SCICAM refocussing]||1.5||C1|| ||
    138138||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Science detector calibrations]||0.5||C3 + C4||P1.5 should be completed.||
    139 ||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Motor/light sources functional verification, filter artifacts/defects verification, and NCPA & internal tip-tilt loop verification]||1.5||C1||P1.7 should be completed.||
     139||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Complete system functional verification, filter artifacts/defects verification, NCPA measurement, and internal tip-tilt loop verification]||1.5||C1||P1.7 should be completed.||
    140140||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Testing of SCICAM image grabbing by SOUL-AO]||0.5||C3|| ||
    141141||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Internal alignment verification]||1||C1|| ||