Changes between Version 249 and Version 250 of docs/CommissioningPlan
- Timestamp:
- 04/22/22 12:36:01 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v249 v250 136 136 ||P1.11||[wiki:/docs/CommissioningPlan/P1.9 Instrument re-alignment]||1 - 6||C1||The duration of this activity, if needed, can be between 1 day to a maximum of 6 days.|| 137 137 ||P1.12||[wiki:/docs/CommissioningPlan/P1.10 Verification of the contrast for coronagraphic masks]||1||C1||P1.10 (and if needed P1.11) should be completed. || 138 || || Total without contingency (if re-alignment is __not__ required)|| **11 days**||138 || || Total without contingency (if re-alignment is __not__ required)||11 days || 139 139 || || Total with 10% contingency (if re-alignment is __not__ required)||**12 days** || 140 || || Total without contingency (if re-alignment is required)|| **12-17 days**||140 || || Total without contingency (if re-alignment is required)||12-17 days || 141 141 || || Total with 10% contingency (if re-alignment is required)||**13-19 days** || 142 142