| 138 | | ||Total||Without contingency ||**11 days** (if re-alignment is __not__ required) || |
| 139 | | ||Total||With 10% contingency ||**12 days** (if re-alignment is __not__ required) || |
| 140 | | ||Total||Without contingency ||**12-17 days** (if re-alignment is required) || |
| 141 | | ||Total||With 10% contingency ||**13-19 days** (if re-alignment is required) || |
| | 138 | || || Total without contingency||**11 days** (if re-alignment is __not__ required) || |
| | 139 | || || Total with 10% contingency||**12 days** (if re-alignment is __not__ required) || |
| | 140 | || || Total without contingency||**12-17 days** (if re-alignment is required) || |
| | 141 | || || Total with 10% contingency||**13-19 days** (if re-alignment is required) || |