Changes between Version 243 and Version 244 of docs/CommissioningPlan


Ignore:
Timestamp:
03/17/22 12:25:50 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v243 v244  
    88|| 0.3 || 14-Jan-2022 || All || Minor corrections and additions || KRA ||
    99|| 0.4 || 28-Feb-2022 || First page, Phase 1 (especially P1.3, P1.4, and P1.6) || LBTO Support is removed from the table. It can be seen inside individual activities. Minor modifications in accordance with  RFA-78, RFA-79, RFA-88. || KRA ||
    10 || 0.5 || 17-Mar-2022 || P1.3 activity || Added a picture showing the space taken by the SHARK-NIR system in cleanroom (Padova)|| KRA ||
     10|| 0.5 || 17-Mar-2022 || P1.3 activity ||Added a picture showing the space taken by the SHARK-NIR system in cleanroom (Padova)|| KRA ||
    1111
    1212== Applicable Documents ==