Changes between Version 242 and Version 243 of docs/CommissioningPlan
- Timestamp:
- 03/17/22 12:25:27 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v242 v243 1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0. 4)=1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.5)= 2 2 [[TOC(inline)]] 3 3 … … 8 8 || 0.3 || 14-Jan-2022 || All || Minor corrections and additions || KRA || 9 9 || 0.4 || 28-Feb-2022 || First page, Phase 1 (especially P1.3, P1.4, and P1.6) || LBTO Support is removed from the table. It can be seen inside individual activities. Minor modifications in accordance with RFA-78, RFA-79, RFA-88. || KRA || 10 || 0.5 || 17-Mar-2022 || P1.3 activity || Added a picture showing the space taken by the SHARK-NIR system in cleanroom (Padova)|| KRA || 10 11 11 12 == Applicable Documents ==