    1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.4)=
     1= SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.5)=
    22[[TOC(inline)]]
    33
     
    88|| 0.3 || 14-Jan-2022 || All || Minor corrections and additions || KRA ||
    99|| 0.4 || 28-Feb-2022 || First page, Phase 1 (especially P1.3, P1.4, and P1.6) || LBTO Support is removed from the table. It can be seen inside individual activities. Minor modifications in accordance with  RFA-78, RFA-79, RFA-88. || KRA ||
     10|| 0.5 || 17-Mar-2022 || P1.3 activity || Added a picture showing the space taken by the SHARK-NIR system in cleanroom (Padova)|| KRA ||
    1011
    1112== Applicable Documents ==