Changes between Version 241 and Version 242 of docs/CommissioningPlan
- Timestamp:
- 03/09/22 22:39:09 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v241 v242 81 81 Each commissioning test/activity has a unified structure as follows: 82 82 83 {{{ 84 Name of the commissioning activity 83 ---- 84 **Name of the commissioning activity** 85 85 - phase: states the phase of the commissioning (1/2/3/4) 86 86 - status: reports the current status of the test description (draft, final, complete) … … 89 89 - duration: estimates the time required to complete the test (the duration mentioned here is valid only for commissioning) 90 90 91 Description 91 **Description** 92 92 - Contains a general description of the test 93 93 94 Prerequisites 94 **Prerequisites** 95 95 - Lists items that must be in place before the test begins 96 96 97 Procedure 97 **Procedure** 98 98 - Explains in detail how to execute the test 99 99 100 Templates 100 **Templates** 101 101 - Mentions the templates to be used. If there are specific parameters, they are mentioned in brackets. For details on the templates mentioned, check AD9. 102 102 103 Success Criteria 103 **Success Criteria** 104 104 - Enumerates the outcome associated with successful completion of the test 105 105 106 Notes 106 **Notes** 107 107 - Additional supporting information 108 108 109 LBTO Support 109 **LBTO Support** 110 110 - Mention if (and what) support is required from LBTO 111 111 112 Date performed and by whom 112 **Date performed and by whom** 113 113 - Mentions who performed the test and when 114 115 }}} 114 ---- 116 115 117 116